VW to build lab/tech center in California

  • 13-May-2011 10:32 EDT

Volkswagen Group of America on May 11 celebrated the groundbreaking of a new 63,000-ft² (2300-m²) facility in Oxnard, CA, for emissions testing and powertrain development. The $25 million lab/tech center replaces an existing facility in Westlake Village, CA, and will open in phases throughout 2012. Doing work for the VW, Audi, Lamborghini, Bentley, and Bugatti brands, it will house engineers from around the world, the company said. The facility will also serve as a customer support center for Bugatti dealers and customers in North and South America.

Share
HTML for Linking to Page
Page URL
Grade
Rate It
4.00 Avg. Rating

Read More Articles On

2016-11-15
Freudenberg Sealing Technologies has expanded its LESS (Low Emission Sealing Solution) lineup to include new products designed to address challenges associated with powertrain friction, smaller spaces, lighter weight vehicles and growth in the electric mobility vehicle arena.
2016-11-15
At least for this moment, all is right with the world as Mercedes-Benz reinstates a new-age version of its iconic inline six-cylinder engine.
2016-11-15
Tanktwo, a Finland-based startup company is rethinking the basic battery cell and challenging the fundamental economics and operational assumptions of EVs. The ingenious concept is worth engineers' attention.
2016-11-14
Conti’s 48-V system will be standard equipment on both gasoline and diesel versions of the Scenic Hybrid Assist model. It is the first of multiple 48-V production announcements coming over the next few years.

Related Items

Article
2016-11-15
Standard
1987-02-01
Training / Education
2011-04-12